Incident Summary:

On July 2, 1994, seven miles west of Glenwood Springs, Colo., lightning ignites a fire in piñon-pine and juniper on a ridge at the base of Storm King Mountain. The entire general area, in a one-year drought, is experiencing low humidities and record-high temperatures. Over the next two days, the South Canyon Fire increases in size. Initial attack resources are assigned. Four days later, on July 6, a dry cold front moves into the fire area. As winds and fire activity increases, the fire makes several rapid runs. Fourteen firefighters perish as they try to outrun the flames.


South Canyon incident map

July 5 – Summary of Activities:

Red flag warnings and very high to extreme fire danger are predicted again today.

A crew of seven firefighters hikes up into the South Canyon Fire at the base of Storm King Mountain. They cut Helispot 1 and begin direct fireline construction downhill along the fire’s edge below this helispot.

The IC orders another district engine crew, one helicopter, and one 20-person hand crew. A load of eight smokejumpers is then substituted for the hand crew.

To support fireline construction, an air tanker retardant drop is requested. After the first load is dropped, due to steep terrain and gusty winds, the IC and pilot agree that more drops would be ineffective.

At 5:30 p.m. the IC and engine crew leave the fire to refurbish equipment. Fifteen minutes later, 8 smokejumpers are dropped at the top of the fire. The IC directs them to work on the fireline from the helispot downhill toward the west drainage.

The Jumper-in-Charge informs the IC that the fire has crossed their fireline and is burning actively. The jumpers begin building fireline on the east side of the ridge.  After sizing-up the current fire, the Jumper-in-Charge orders two Type 1 hand crews. By 10 p.m., the fire has grown 20 acres today. It now covers 50 acres.

Discussion Points:

Downhill fireline construction is hazardous in steep terrain, fast-burning fuels, and rapidly changing weather. Downhill fireline construction should not be attempted unless there is no tactical alternative.

If your fire crew was assigned to construct fireline downhill on Storm King, what would your concerns be? Could you perform this operation safely? (Reference page 1, 6 and 8 in your IRPG for this discussion.)

 

Last Modified / Reviewed:


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508