Skip to main content

PMS 448

Helmet – Flight, SPH-5C, Regular, w/Bag

NFES #
002314
Category
Aviation
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. If helmet carton is unopened inspect carton for signs of crushing, drops or water damage. If carton is damaged, open and inspect helmet following remaining inspection processes.
  2. Visual inspection indicating use or missing parts (screws, visors, worn cords, etc.)
  3. Structural damage (cracked shell, visor housing, booms, etc.)
  4. Structural damage preventing repair and refurbishment (cracked helmet shell, salvage useable part and dispose of helmet shell)
  5. Visual inspection for SPH-4 helmets as flight helmets must meet requirements in Instruction Memo No. 96-2006 which states: SPH-4 Helmet should be converted to SPH-5 Helmets or disposed of.
  6. Return to inventory if helmet has been unused and carton does not show signs of damage.
  7. Send for refurbishment if any item found during inspection such as use or missing parts appear to be repairable
  8. Dispose of helmet if structural integrity is compromised. Salvage usable parts.

A. Cleaning

  • Use general purpose cleaner. (Do not use bleach, paint remover, thinner, or acetone on flight helmet shell. It may cause damage)

B. Repair

All refurbishment will be conducted by certified personnel (trained by NIFC ramp services).

  1. Earphones
  2. Microphone
  3. Cord assembly
  4. Microphone cable assembly
  5. Replace missing or damaged parts
  6. Replace thermoplastic liner (TPL) in SPH-5 TPL
    • Size Regular NFES #003063
    • Size XL- NFES #003064
    • Size Small NFES #003065. Contact address below for further information.

Refurbishment and repair may be performed by the following:

National Interagency Fire Center Ramp Services
3833 S. Development Avenue Boise, ID 83705
Phone: 208–387–5529 Fax: 208–387–5785

C. Testing for Performance

  • Re-test avionics if anything has been repaired or replaced

D. Repackaging

  1. Place flight helmet inside helmet bag
  2. Package 1 each in carton NSN 8115-00-079-8680, (12” x 12” x 12”).

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508