Skip to main content

Tank – Gasoline, 5 GL (18.9L), Pump Adapted

NFES #
000218
Category
Fuel Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Check for fuel in tank.  Evacuate tank if fuel is present.
  2. Inspect threads on connector for serviceability.  Inspect for missing or cracked and damaged gasket on cap.  Inspect all interior surfaces for rust that has pitted, is flaking or is lifting the interior surface.  Rust spots larger than a quarter or collectively multiple areas larger than a quarter will render the can unserviceable.  Some “flash rust” maybe present and is acceptable.  Using a mirror and flashlight, inspect the ceiling of the can for additional rust.
  3. Inspect for impacts or dents to corners and seams as separation and/or leaks may occur.
  4. Inspect and tighten quick release fuel valve. 
  5. Return to stock if clean and in unused condition.
  6. Refurbish item if tank is free of damage or rust.
  7. Dispose of item if tank damage is significant, leaks are detected or rust is found inside of tank.

Refurbishing Procedures

A. Cleaning

  1. Drain existing fuel and purge. Dispose of fuel according to hazardous material regulations and local policies.
  2. Use an air hose to dry the interior of the tank and remove debris inside the female opening of the quick disconnect coupling.
  3. Turn upside down with lids off to dry.
  4. Clean vent hole to ensure serviceability.
  5. Wipe down outside of container and repaint if necessary.

B. Repair

  1. Replace missing, cracked or stiff gaskets.
  2. Ensure fuel geyser warning label is present and legible. Reference cache memo 17-2 Fuel Geysering Awareness Sticker and Labels.
  3. Flammable liquid labels are not required for this fuel tank. Refer to NWCG Standards for Transporting Fuel, PMS 442.

C. Testing for performance

  1. Check all threads on connector for serviceability.

D. Repackaging

  1. Local cache option
  2. Recommended when shipping, pack in carton NFES #008052 (16”x14”x10”)

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508