Skip to main content

Nozzle – Twin Tip, Combination, 1” NPSH-F

NFES #
000024
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for obvious damage, cracks, and large burrs.
  2. Inspect for gasket and screen.
  3. Inspect handle for damaged or missing screw. Ensure handle is in the correct position and turns freely into the proper positions.
  4. Inspect for fire damage. Fire damage may cause failure in the future.
  5. Inspect hose coupling threads for damage.
  6. Return to stock if nozzle is clean and shows no sign of damage or use.
  7. Refurbish if damage is repairable or if missing components are replaceable.
  8. Dispose of item if damage is excessive, or if nozzle fails Testing for Performance and deficiencies are not correctable.

Refurbishing Procedure

A. Testing for Performance

  1. Install nozzle on pump.
  2. Open handle on nozzle.
  3. Turn on water.
  4. Inspect and operate straight stream tip and fog tip ensuring neither is clogged. Clear obstructions if present.
  5. Close handle.
  6. Pressurize nozzle to 300 PSI. Test at pressure for 3 minutes.
  7. Inspect for leaks:
  • Gasket
  • Under the handle
  • At both tips

B. Cleaning

  1. Clean in a dish washing detergent with brush, scouring pad or high-pressure wash as needed. Do not soak for extended periods of time as the detergent will corrode the metal.
  2. Rinse thoroughly, stand upright with handle in open position and allow to air dry.

C. Repair

  1. Replace handle and ball with a new kit if needed.
  2. Replace tail gasket and/or screen if missing, cracked, or stiff. Nozzle will have a 3/16” straight-stream tip (NFES #000637) and a 2-4 gal/min fog tip (NFES #000635).
  3. Apply silicone based 0-ring lubricant to O-rings if needed.

D. Retesting

  • Following completion of any repairs, retesting of nozzles must be completed following Testing for Performance, above.

E. Repackaging

  1. Stand upright and dry completely prior to repackaging.
  2. Jute twine through valve and lower nozzle.
  3. Package in units containing nozzle body with a 3/16” straight-stream tip, NFES #000637 and 2-4 gal/min fog tip, NFES #000635.
  4. Package 20 each in NFES #008010 carton (16 3/8” x 13 5/8” x 7” w/ insert).

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508