Skip to main content

Nozzle – Garden Hose, 3/4” NH, Adjustable

NFES #
000136
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for burrs and damaged threads. Inspect for missing, cracked, or damaged gasket.
  2. Barrel should turn freely
  3. Return to stock if item passes inspection, is clean and has not been used.
  4. Refurbish if item passes inspection and repairs are economically feasible.
  5. Dispose of item if burrs or damaged threads are found, if barrel does not turn freely, and if nozzle fails Testing for Performance.

Refurbishing Procedures

A. Testing for Performance

  1. Pressure testing: Attach to high pressure pump and turn on pump to 100 PSI. There is no amount of time specified to conduct this test.
  2. Inspect for leaks:
  3. Around the gasket.
  4. Behind the barrel.
  5. The tip of the barrel.

B. Cleaning Procedures

  1. Wash and clean of mud, dirt, and grease.
  2. Clean in a mild detergent with brush or scouring pad or high-pressure wash.
  3. Rinse thoroughly.

C. Repair

  1. Replace gasket as necessary
  2. Chase threads and remove small burrs with small file if damage is minimal.                                  
  3. Stand upright and dry completely prior to repackaging.

D. Retesting

  1. Following completion of any repairs, retesting of nozzles must be completed following Testing for Performance, above.                                                                                                                          

E. Repackaging

  1. Stand upright to drain water and dry.
    • Package 60 EA in NFES#008064 carton (10”x8”x6”). BRASS and ALUMINUM.
    • Package 10 each, local cache option.

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508