Nozzle – Plastic, 35 GPM, 1” NPSH-F

NFES #
000138
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for burrs and cracks, broken plastic, or fire damage. Inspect gasket and replace if missing, cracked, or stiff.  Inspect for screw and nylon washer.  Inspect hose coupling threads for damage.
  2. Barrel must turn freely.
  3. Return to stock if nozzle functions properly, is free of damage and clean.
  4. Refurbish if nozzle is repairable.
  5. Dispose of any nozzle that is damaged beyond repair, has burn damage, or fails Testing for Performance and deficiencies cannot be corrected. Old style KK: Inspect threads inside of barrel; if they are damaged, dispose of nozzle.

Refurbishing Procedures

A. Testing for Performance

  1. Replace gasket if necessary.
  2. Connect nozzles to pump or manifold. Confirm connection ends are not out of round and there is no damage to threads.
    1. Pressure Test:
      1. Start pump.
      2. Make sure nozzles are open. Let all air escape. Shut nozzles.
      3. Pressurize to 300 PSI and hold for 3 minutes
  3. Inspect for leak:
    • Around the gasket
    • Behind the barrel
    • The tip of the barrel
      ​Note: Due to manufacturing processes a water tight shut-off seal on NFES #000137 and #000138 is very difficult to attain. Minimal drips or slight mist spray from the tip are acceptable for RFI condition.

B. Cleaning

  1. All items will be washed and cleaned of foreign matter, such as mud, dirt, and grease. Clean in a mild detergent with brush and scouring pad, or high pressure wash as needed. Do not soak for extended periods of time as the detergent will corrode the metal.
  2. Rinse thoroughly.
  3. Stand upright with barrel in open position to drain water and dry.
  4. Lubricate threads on back of the barrel with appropriate dry lubricant (graphite).

C. Repair

  1. Replace gaskets, washers or screws as needed.
  2. If plastic nozzle is found defective, dispose (NFES #000137, #000138).

D. Retesting

  • Following completion of any repairs, retesting of nozzles must be completed following Testing for Performance, above.

E. Repackaging

  • Stand upright and dry completely prior to repackaging.
    • Use NFES #008064 carton (10” x 8” x 6”)
    • Use NFES #008018 carton (12” x 12” x 6”) 10 PER CARTON 
    • Use NFES #008017 carton (18” x 12” x 10”) 60 PER CARTON

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508