Skip to main content

Tank – Folding, 1500 GL (5678.1L), w/Frame

NFES #
000664
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect frame for broken or bent parts, cracks or separations in the welds. Inspect the liner for pin holes, tears, or rips and missing grommets. Inspect for frayed or damaged rope or missing nylon ties securing liner to frame.
  2. Return to stock if item is clean and in unused condition.
  3. Refurbish item if able to clean and repair. For repairs requiring materials or skills not found at the local cache, contact manufacturer to determine if it is economically feasible to have manufacturer repair tank.
  4. Dispose of item if damages are not economically feasible to repair.

Refurbishing Procedures

A. Cleaning

  1. Clean tank liner and frame, inside and outside, with soapy water and a brush or high-pressure wash and rinse.
  2. Allow to air dry on both sides.

B. Repair

Frame

  1. Straighten frame.
  2. Weld all cracked or broken welds on frame.
  3. Remove rust. Paint as needed.
  4. Lubricate hinges with appropriate lubricant.

Liner

  1. Patch any hole or tears. Small pin hole can be repaired with manufacturer recommended TEARAID® Type B or other similar material recommended by the tank manufacturer. Larger holes should be patched with material recommended by the manufacturer utilizing a vinyl welding process. For extremely large holes, contact the tank manufacturer for recommended repair or replacement options.
  2. Replace any missing grommets. If two or more grommets are missing in succession and new grommets cannot be installed, replace liner.
  3. The use of cable ties or ¼” nylon rope is recommended for securing the liner to the frame. Ensure that ties or ropes are secure. Replace or tighten as necessary. When using cable ties, use one per grommet and utilize large cable ties at corner and midpoints. Use smaller ties in all other grommets. When using rope, secure one end to the frame. Using a lacing motion, go through the grommet, over the frame and through the next grommet. Continue this motion until entire liner is attached to frame. Secure end.
  4. Stencil correct NFES # of item on side of tank if missing or unreadable.

C. Testing for performance

  1. Verify hinges operate smoothly.
  2. Check all patches to insure they are secure and there are no loose edges.

D. Repackaging

  1. Fold the tank ensuring that liner is not pinched during process. Only a minimum, if any, amount of liner is to extend outside the metal frame.
  2. Band 1,000GL tank near ends, Band 1,500GL tank near ends and in the middle.
  3. Secure on pallet.

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508