Skip to main content

Tank – Dip, 15,000 GL (Heliwell)

NFES #
000669
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Observe condition prior to take down or after setting up unit following manufacturer’s assembly procedures.
    • Look at rim covers and inspect attached webbing.
    • Remove rim covers and inspect top of tank for abrasions or tears.
    • Look in tank for slices or holes and mark with felt pen if repairs needed.
    • Inspect panels to ensure they are not bent or misshapen and attached clips are functional.
    • Inspect turn buckles and cables for frays and burrs.
  2. Return to stock if unused.
  3. Refurbish item, if repairs are extensive, refer to SEI Industries website.
  4. Dispose of irreparable components and replace as necessary.

Refurbishing Procedures

A. Cleaning

  1. Clean tank liner and panels, inside and outside with soapy water and a brush or highpressure wash and rinse.
  2. Rinse well with clean water from high-pressure washer.
  3. Allow to air dry on both sides.

B. Repair

  1. Weld all cracked or broken welds on aluminum panels.
  2. Patch any damaged areas marked in liner. All patches should be welded with patch material that is recommended by the manufacturer.
  3. Rivet rim covers if missing.
  4. Straighten panels and replace clips if needed.
  5. File off burrs on turn buckles.
  6. Replace any missing or damaged fittings, valves, adapters or caps.

C. Testing for performance

  • Verify panels are close together by inspecting placement.

D. Repackaging

  1. Fold tank liner into a shape that fits underneath one panel. See Heliwell operator’s manual on SEI website.
  2. Place folded liner on a pallet and stack panel atop tank.
  3. Box other components together and place on pallet.
  4. Strap down tank, panels, and boxed components securely.

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508