  1. Inspect vinyl, fabric, and webbing for any holes, cuts, tears, burns, or torn seams that are not economically repairable, if any dispose of.
  2. Inspect plastic cap and fittings for cracks, breaks, missing gaskets or other damage.
  3. If bag appears to be used, inflate bag with air (<10 psi), submerge in water and check for leaks.  Dry vinyl and mark holes with black marker for patching in repair process.
  4. Inspect for any missing fasteners or that does not provide adequate closure.
  5. Inspect for excessive dirt or fuel stains that cleaning cannot eliminate, dispose of.
  6. Inspect for any writings, drawings. Dispose of if cleaning cannot remove markings.
  7. Return to stock if item does not show any signs of use and passes visual inspection.
  8. Refurbish if damage detected is repairable.
  9. Dispose of item if unable to repair.

Pump

  1. Inspect for obvious damage. 
  2. Inspect for burns and cracks if so dispose of.
  3. Inspect for damaged threads, if beyond repair dispose of.  Ensure tip is secured to wand with a 3”-4” length of ball chain.
  4. Place hose in water and pump handle to validate that pump works properly.
  5. Return item to stock if it shows no sign of use or damage.
  6. Dispose of item if unable to repair.

Refurbishing Procedures

A. Cleaning

Bag

  1. Remove straps and clean exterior of bag thoroughly with filler cap attached.
  2. Support or hang bag, remove cap and fill with water to rinse out tank.
  3. Replace cap and shake bag vigorously until all foreign matter is removed.
  4. Drain completely.
  5. Invert bag after removing cap and empty as much water as possible.
  6. Let dry inverted for 1 hour in sun, if possible.
  7. Clean the straps with mild detergent and stiff bristle brush, machine launder, or gently pressure wash. Hang to dry.

Pump

  1. Wash and clean all items of foreign matter, such as mud, dirt, and grease.
  2. Clean in mild detergent with brush or scouring pad as needed.
  3. Rinse thoroughly.

B. Repair

Bag

  1. Patch any hole or tears.  No more than 3 patches should be present on the bag.  If more, dispose of bag.  Small pin hole can be repaired with TEAR-AID® Type B or other similar material recommended by the tank manufacturer.
  2. Larger holes can be repaired utilizing vinyl welding tools and techniques if available.
  3. Holes in the seams may not be repairable.
  4. Place patch on damaged area and apply pressure with roller or suitable device for at least 1 minute.
  5. The filler neck and cap can be replaced following the instructions included in the Fedco Bag Filler Neck Service Kit, part #181874.
  6. Repair or replace any damaged components on bag or straps.
  7. Ensure bags are stenciled with “non-potable” or “suppression use only”.

Pump

  1. If pump pressure is not sufficient, remove pump unit and replace O-rings.
  2. Ensure quick connection on pump has proper seating.
  3. Check hose connection to pump for tightness; if loose, use a hose clamp.
  4. Replace length of ball chain between wand and removable tip if missing.
  5. Check supply hose on pump assembly for obstructions and tight connections, bent push rods, and clogged tips.
  6. Check spring and ball bearing.
  7. Lubricate slide with appropriate lubricant, e.g., Chevron NLGI2 or equivalent.

C. Testing for Performance

  1. Re-inspect any patches or repairs.
  2. Fill with air (<10 psi).  Spray patched area with soapy water and inspect for leaks.

D. Repackaging

  1. Place pump in the center and roll bag around pump as tightly as possible, secure with plastic banding or rope to keep from unrolling.
  2. 8 each in NFES 002006 carton (23” x 19” x 10”).

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508