Skip to main content

Tank – Snap, 1000 GL

NFES #
007614
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for all parts and components to form a complete tank; 8 vertical legs, 16 snap support bars, 1 liner, 1 carrying bag and one 3” plug. Inspect for broken or bent legs and support bars. Inspect liner and carrying case for rips, tears, or punctures. Check threads on plug and flange assembly for damage.
  2. Return to stock if all components are accounted for and tank is clean and in unused condition.
  3. Refurbish if damaged or dirty components are repairable and, can be replaced or cleaned. Refurbish liner if economically feasible. Contact manufacturer for repairs requiring materials or skills not found at the local cache to determine if it is economically feasible to have manufacturer repair tank.
  4. Dispose of damaged components or complete tank if damage is excessive.

Refurbishing Procedures

A. Cleaning

  1. Dismantle and wipe all metal parts with a damp cloth.
  2. Power wash liner and clean bag with mild soap, using a stiff brush if necessary.

B. Repair

  1. Replace missing or broken parts of frame.
  2. File all burrs smooth on metal components.
  3. Suspend tank and mark any holes or damage needing repair.
  4. Patch all marked damaged areas. Patch any hole or tears. Small pin hole can be repaired with manufacturer recommended TEAR-AID® Type B or other similar material recommended by the tank manufacturer. Larger holes should be patched with material recommended by the manufacturer utilizing a vinyl welding process. For extremely large holes, contact the tank manufacturer for recommended repair or replacement options.
  5. Replace all damaged hose couplings and drain plugs.
  6. Stencil correct NFES # of item on collar of tank if missing or unreadable.
  7. Ensure all locking buttons snap into place and lubricate as necessary.

C. Testing for performance

  • None

D. Repackaging

  • Local cache option.

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508