Skip to main content

Create the Edit Project


The Edit Project is where all data editing should be done to prevent database locks and ensure proper attribution. It is saved to the Projects folder*.

Each GISS should have their own Edit Project with properly configured feature templates.

The naming convention for the Edit Project is edit_2025_{incidentName}_{localIncidentID}_{yourName}.

  1. Save As on the Pro Project Template to create a new project at the root of the \projects folder, and name it edit_2025_{incidentName}_{uniqueFireID}_{yourName}.
    This is the Edit Project, all data editing should be done here. 

    Edit the project

*Do not save the Edit Project in a OneDrive synced folder. If using OneDrive to sync the GeoOps directory from the incident’s SharePoint files, save the Edit Project to a logical place on your local C: drive such as C:\2025_Incidents\2025_Demo.
  1. Add “edit” as the {MapType} to the Map View title.   

    Edit the Map View title
     

  2. Open the DynamicTextUpdate table and fill in the IncidentName and UniqueFireID attributes. If the incident name is more than one word, do not use CamelCase in attribute tables; use a space (e.g. “Cedar Creek”). 

    Add dynamic text


    Note: Values in the DynamicTextUpdate table will populate dynamic text elements in every template layout in every ArcGIS Pro project for the incident. It should be edited from the Edit Project while all other projects are closed so the updated values will populate properly. This provides a single source to update the current acreage and other attributes for all layouts at once. Additional attributes can be added and utilized with their own Dynamic Text tags. Multiple rows can now be utilized with the use of a custom query.

  3. Save the edits to the table.

 

Modified / Reviewed:

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508