Skip to main content

Export to the Progression GDB


There are a multitude of ways to create the Progression Map and to store the required perimeters. No one way is right or required, as long as the data and the resulting map follow GeoOps standards in naming, attribution, and structure.

However, following the best practices outlined here will allow for the greatest flexibility in the process and ease of data access and use.

The Wildfire Daily Fire Perimeter should be exported after every update, starting on day one. It is always easier to do immediately rather than searching through backups.

  1. From the Edit Project, select your incident’s Wildfire Daily Fire Perimeter in the Event Polygon layer.
  2. Export the selected Wildfire Daily Fire Perimeter. 

    Event Polygon layer wildfire daily fire perimeter

  3. Save the Wildfire Daily Fire Perimeter as a feature classes to the Progression GDB preserves the Event Schema and allows for easily combining data. Ensure the date and time the perimeter was collected are saved in the name (part of the GeoOps Standard) and the attributes (PolygonDateTime, a required-when-applicable field in the Event Schema). This way the perimeter date is easily found from any interface and preserved if/when data is combined. 

    Wildfire daily fire perimeter feature class

 

Modified / Reviewed:

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508