Skip to main content

Incident Action Plan (IAP) Map

Product Description

The Incident Action Plan (IAP) map is the primary map used by field operations personnel and it is an essential tool for firefighter safety. The IAP map effectively communicates incident management objectives in addition to geographic and incident features.

The IAP map is used by operations staff to display field assignments, crew instructions, and division safety concerns at operational briefings and breakout meetings. IAP maps are typically at 1:24,000 scale and either printed small enough to be carried into the field or produced digitally for use on a mobile device. An incident may fit on one page or tiled across multiple pages (Multi-Page IAP Map).

The IAP map is a component of the Incident Action Plan.

Target Audience

Incident field personnel.

Guidelines

Apply for digital or hard copy maps.

  • Standard Incident Command System (ICS) symbology.
  • Letter (8½” x 11”) or tabloid (11”x 17”) size.
  • Mapped area should cover the incident area and predicted spread.
  • Generally 1:24,000 scale; 1:63,360 scale in Alaska (Situation Unit Leader (SITL) may direct other scales).

Standard Elements

All map products produced should include the STANDL-SGD cartographic elements and an index page for multi-page products.

Data

  • Wildfire Daily Fire Perimeter (Polygon) with Contained and Uncontained Perimeter Lines.
  • Event Lines (including, but not limited to: Planned and Completed lines, Access Routes, Escape Routes).
  • Event Points (including, but not limited to: Camps, Dip Sites, Draft Sites, Drop Points, Hazards, Helispots, Helibase, Incident Command Post, and Safety Zones).
  • Assignment (Division, Branch, Zone) breaks and labels.
  • Land Ownership / Jurisdiction.
  • Special Management Areas (including, but not limited to: Wilderness, Wilderness Study Areas, Inventoried Roadless Areas).
  • Structures.
  • Utilities (including, but not limited to: Powerlines, Substations, Pipelines).
  • Topographic Base.
  • Other Situation Unit Leader (SITL)-requested data. 

Examples

These are examples from actual incidents and may include non-standard elements.

Also note that examples use the standard symbols at the time of their creation and may not reflect the current GeoOps symbology.

Map elements, incident features, and composition remain consistent across these visual changes.

  1. 2022 Dodge Springs Fire
  2. 2010 Wrangler Fire
  3. 2015 Sucker Creek Fire
  4. 2016 Buffalo Fire (a non-suppression fire)
  5. 2017 Sunrise Fire (Multi-Page IAP)
  6. 2016 Beaver Creek Fire (Multi-Page IAP)
  7. 2017 Burro Fire (Multi-Page IAP)

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508