Skip to main content

2024 WOR: Team Dynamics

 Day 1  |  Day 2  |  Day 3  |  Day 4  |  Day 5  |  Day 6  |  Day 7  |  Letter to Leadership

 

Team Dynamics

The Mendocino Complex had a multitude of resources including two Type 1 Incident Management Teams (IMTs) and over 4,000 people from 34 agencies at the height of the incident. Each one of those groups were in some stage of team development and were expected to collectively work together to accomplish incident objectives. The Incident Command System (ICS) is designed to have a breakdown structure of teams that combine and separate as needed.  For example, each functional area (finance, logistics, operations) that make up the “team” of an IMT can have its own entire team. Even within those teams there are further sub-teams (Operations > Branch 1 > DIV Z > IHC).  The concept of “Teams” as it pertains to wildland fire is nebulous and dynamic. 

“With each team comes a different culture and method of operation – one not better than the other – just different.”
— FLA participant

A healthy team dynamic is critical for developing a common operating picture and having synergy working towards a collective goal. The irony with teams is that they’re made up of unique individuals with different thoughts and beliefs. To capitalize on those unique perspectives the team must dedicate themselves to reflection and continuous assessment to improve team effectiveness. Pre-season coordination meetings, daily After Action Reviews (AARs), pre-operational meetings, planning meetings, and closeouts are just a few examples of tools that help teams to continually evolve and operate at peak performance.

All teams must go through stages of development. The most common model to illustrate this path was developed in the mid-1960s by Bruce W. Tuckman. Each of Tuckman’s stages have their own recognizable emotions, actions, and behaviors; understanding and accepting the unique differences within the stages of team development is essential for continued growth. The phases in Tuckman’s model are rarely static.  Even the highest performing teams can be plunged back into the early stages of team building by factors such as change of task, change of cast, or other external factors.

Many authors have written variations and enhancements to Tuckman's work, but his descriptions of Forming, Storming, Norming, Performing and Adjourning still provide a useful model for looking at your own team.
 

Discussion Questions:

  • Have you observed the different stages of team development? Discuss what stage your team is at now. 
  • How does your crew, module, team fit into the larger picture of an Incident Management Team? How do you incorporate a team within a team?
  • What contributes to rapid team synergy? What can hinder reaching team synergy?
  • What constructs are built into the ICS system to promote successful team building and teamwork?
     

Resources:

 

Last Modified / Reviewed:


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508