Skip to main content

Bag – Slingable, Water, 72 GL, Non-Potable

NFES #
000426
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Visually inspect for missing components, or need for repair such as: straps, hoses, spigot, cap, and gasket.
  2. Return to stock if in unused condition.
  3. Refurbish if dirty or need repair.
  4. Dispose of item if it fails inspection and/or is damaged beyond repair.

Refurbishing Procedures

A. Cleaning

  1. Clean exterior of tank thoroughly with filler cap attached.
  2. Support or hang tank with spigot closed, remove cap and fill with water to rinse out tank.
  3. Replace cap and shake bag vigorously until all foreign matter is removed.
  4. Drain completely through hose and spigot.
  5. Invert bag after removing cap, open spigot and empty as much water as possible.
  6. Let dry inverted for 1 hour in sun, if possible.

B. Repair

  1. Fill with air and look for leaks, visually inspect bags for rips, tears, or obvious defects.
  2. Use a black permanent marker to indicate damage, keeping all markings simple and professional.
  3. In a well ventilated area clean area around damaged spot with lacquer thinner or other suitable cleaner.
  4. Apply suitable glue (manufacturer’s recommendation) to both surfaces (patch and tank).
  5. Let dry until tacky.
  6. Place patch on damaged area and apply pressure with roller or suitable device for at least 1 minute.
  7. Repair or replace any damaged components.
  8. Ensure bags are stenciled with NFES number and “non-potable” or “suppression use only”.

C. Testing for Performance

  1. Re-inspect any patches or repairs.
  2. Fill with air to test for leaks.

D. Repackaging

  • Ensure that tank is stenciled visibly with the words “NON-POTABLE” or SUPPRESSION USE ONLY” and proper NFES # is stenciled on tank.
    • Use NFES #008070 carton (18” x 15” x 5.5”) for NFES #000426.
    • For NFES #006017 and #006021, use local cache option for carton.

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508