Skip to main content

Valve – Shut Off, 1”

NFES #
001201
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for obvious damage including burrs and thread damage, gaskets missing or damaged, a female collar that must turn freely if applicable, and inspect for damage caused by fire exposure.
  2. Return to stock if item is clean, passes inspection and is in unused condition.
  3. Refurbish if deficiencies are discovered during the inspection process and item requires cleaning.
  4. Dispose of item if damages are not repairable or item has sustained damage caused by fire.

Refurbishing Procedures

A. Cleaning

  1. Clean in a mild detergent with brush and scouring pad or use parts washer or high pressure wash to remove foreign matter such as mud, dirt or grease. Rinse thoroughly.
  2. Do not soak for extended periods of time as detergent will corrode the metal.
  3. Stand upright with barrel in open position to drain water and dry.

B. Repair

  • Replace missing or damaged gaskets or components that are serviceable.

C. Testing for Performance

  1. Install valve on test pump.
  2. Turn on water to pump and open valve to expel air then close valve.
  3. Turn on pump
  4. NFES #001201 and NFES #001207 test at 300 PSI for 3 minutes.
  5. NFES #000835 and NFES #000738 test at 100 PSI for 3 minutes.
  6. Inspect for leaks around the gasket and at the handles while on test pump.
  7. If valve leaks, repair as necessary or dispose of through local procedures.
  8. Retest after repairs are made.

D. Repackaging

  1. Ensure item is completely dry prior to packaging.
  2. Packaging:
    • Use NFES #008066 carton (12” x 9” x 10”) for the following: NFES #001201, #001207 standard pack of 20 EA per carton. 
    • Use NFES #008064 carton (10” x 8” x 6”) for the following: NFES #000835 standard pack of 50 EA per carton. 
    • Use NFES #008076 carton (8” x 4” x 4”) for the following: NFES #000738 standard pack of 10 EA per carton.

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508