Skip to main content

PMS 200

Crews, PMS 200

Hand Crews

Minimum Crew Standards for National Mobilization

Minimum Standards Type 1 IHC (Interagency Hotshot Crew) Type 2 with IA (Initial Attack) Capability Type 2
Fireline Capability Initial attack/can be broken up into squads, fireline construction, complex firing operations (backfire). Initial attack/can be broken up into squads, fireline construction, firing to include burnout. Initial attack, fireline construction, firing as directed.
Crew Size 18 - 22 18 - 20
Leadership Qualifications Permanent supervision:
Supt.: TFLD, ICT4, FIRB
Asst. Supt.: STCR or TFLD and CRWB and ICT4
3 Squad Leaders: CRWB and ICT5
2 Senior Firefighters: FFT1
Crew Boss: CRWB
3 Squad Bosses: ICT5
Crew Boss: CRWB
3 Squad Bosses: FFT1
Language Requirement All senior leadership, including Squad Leaders and higher must be able to read and interpret the language of the crew as well as English.
Experience 80% 1 season 60% 1 season 20% 1 season
Full-Time Organized Crew Yes (work and train as a unit 40 hours per week. No No
Communications 8 programmable radios 4 programmable radios
Sawyers 4 certified as FAL2 and 50% of crew certified as FAL3 or better. 3 agency-qualified None
Training As required by the Standards for Interagency Hotshot Crew Operations or agency policy prior to assignment Basic firefighter training and/or annual fireline safety refresher prior to assignment Basic firefighter training and/or annual fireline safety refresher prior to assignment
Logistics Crew level agency purchasing authority No purchasing authority No purchasing authority
Maximum Weight 5,300 lb
Dispatch Availability Available nationally Available nationally Variable
Production Factor 1.0 .8 .8
Transportation Own transportation Transportation needed Transportation needed
Tools & Equipment Fully equipped Not equipped Not equipped
Personal Gear Arrives with: Crew first aid kit, personal first aid kit, headlamp, 1-qt canteen, web gear, sleeping bag
Personal Protective Equipment (PPE) All standard designated fireline PPE
Certification Must be annually certified by the local host unit agency administrator or designee prior to being made available for assignment. N/A N/A

N/A = Not applicable

Crew Resources

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508