Skip to main content

Create Incident Maps and Digital Products


GISS Workflow Diagram: Create Incident Maps and Digital Products

Create Incident Maps and Digital Products – Repeat as Necessary

  1. Create or Update Incident Map(s).
    1. Use an existing Master Project or open the Pro Project Template and Save As to create a new Master Project per GeoOps.
    2. Repair path of Event layer file(s)  to point to the Master Incident GDB.
    3. Add base maps and ancillary datasets to map.
    4. Create a layout or make a copy of a provided layout template for the desired map product.
    5. Apply definition queries to display only the Event Features appropriate for the intended map audience.
    6. Use dynamic labeling where applicable and create annotation as necessary.
    7. Ensure all essential map elements are present and correct (STANDL SGD).
    8. Export Geospatial PDF map per GeoOps standards.
  2. Create and share public web products.

GIS Workflow, explained below

Figure 1.Create Incident Maps and Digital Products
(click image to open larger)

 

General Map Guidelines

The maps presented in this section are not all-inclusive, only maps that have specific processes or analysis are listed. The most common maps requested of a GISS are listed in the NWCG Standards for Geospatial Operations (GeoOps), PMS 936, Map Product Standards Section. For uncommon products, the desired elements are typically provided by the person requesting the map through the Situation Unit Leader (SITL). If not, the GISS should request additional guidance.

Other Procedural considerations include:

  • The SITL (or equivalent) decides which maps to produce and approves final versions.
  • The SITL directs the use of logos.
  • Placement of fire acreage (and total acreage reported) on maps is at the discretion of the SITL.
  • The GISS should consider the page size and whether color is needed; many maps may need specific formatting and may be reproduced on black and white copy machines.
  • The GISS schedules map production to meet specific deadlines.
  • North arrow may need to be rotated to indicate true north correctly.
  • Drafts: Maps that are for review only may include “DRAFT.”
  • Sensitive information: Maps may need labels defining the sensitivity of the data (e.g., For Official Use Only, Not for Public Distribution or Use).
  • Disclaimers: Maps may include disclaimers if requested or required under delegated authority (e.g., For Reference Only).
  • Proprietary information: Maps should cite the source for any proprietary information.

Responsibilities

Timelines for map production are established with the SITL, Planning Section Chief (PSC), or the assigned supervisor. The GISS generates all products on time for scheduled briefings and other meetings. Map definitions should be used as general guidelines; the SITL or PSC has the authority to deviate from the standards

Communications

All incident map requests are channeled through the SITL or PSC so they are kept informed of the GISS workload and can help prioritize needs. The SITL or PSC may instruct the GISS to work with the end-user of the map to clarify map product requirements. Final map products are approved by the SITL or PSC (or assigned supervisor) before release, unless otherwise arranged.

Job Aids

Modified / Reviewed:

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508